PARACHUTE
RIGGING
Sport Parachute Rigging
PARACHUTE RIGGING
610 327-8555
- Reserve Canopy Inspection and Repack
- Tandem Reserve Canopy Inspection and Repack
- Main Canopy Inspection
- Reserve Canopy Assembly, Inspection and Pack
- Tandem Reserve Canopy Assembly, Inspection and Pack
- Assembly and Inspection Main Canopy
- Pilot Emergency Parachutes Inspection and Repack
- Wash Harness and Container
- Small Patches
- #0 Grommets Replacement on Container
- Main Closing Loop
- Harness Work
- Line Sets
- Replace the Lower Steering Lines
Reserve Inspection and Repack
Tandem Reserve Inspection and Repack
Assembly, Inspection and Pack the Reserve Canopy
Main Canopy Inspection
Install a Complete Line Set
Replace the Lower Steering Lines
Replace #0 Grommets on Containers
Small Patch
Large Patches
Harness Work
Main Closing Loop
Wash Harness and Container
Assembly and Inspect the Main Canopy
Tandem Reserve Inspection and Repack
PARACHUTE RIGGING SCHOOL LEARN ABOUT